国内我的网站主页 > 我的网站国内 >
摘要:夜行书生...

落日余晖

Severe Drought Causing Ruins of Ancient Roman Bridge Built Under Nero's Reign to Reemerge From Tiber_我的网站

巨星秀

一 |     An ancient bridge built during the reign of the Roman Emperor Nero has recently emerged from the waters of the Tiber River that usually conceal it, Libero Tecnologia reports.,According to the media outlet, the bridge, whose construction was actually ordered by Nero’s predecessor Caligula, was demolished in 500 AD in order to prevent the Goths from entering and plundering the city, and the remains of the structure have since rested beneath the flowing waters of the Tiber, only reemerging on rare occasions when water level in the river falls “too low.”,The development, Libero Tecnologia warns, is actually a worrisome sign, as Rome and the entirety of Lazio are “on drought alarm,” and the water level in the Tiber had dropped by six centimeters in six days, reaching a state that has only been “seen a few times before.”,Namely, the depth of the Tiber dropped to 1.12 meters this month, while normally it should be between 4 and 5.5 meters.,The situation has occurred amid a lack of rainfall in Rome – the media outlet states that it hasn’t rained there for over a month.,Meanwhile, Nicola Zingaretti, the president of Lazio, reportedly declared a “state of natural disaster,” with local residents and companies being advised not to waste water.。    

Phase I Bozhong 19-6 gas field, China's first 100-billion-cubic-meter gas field in the Bohai Sea, has entered full operation, CNOOC Tianjin Branch announced on August 9, 2026. Photo: Screenshot from the People's Daily
    Phase I Bozhong 19-6 gas field, China's first 100-billion-cubic-meter gas field in the Bohai Sea, has entered full operation, CNOOC Tianjin Branch announced on August 9, 2026. Photo: Screenshot from the People's Daily
Phase I Bozhong 19-6 gas field, China's first 100-billion-cubic-meter gas field in the Bohai Sea, has entered full operation, with daily oil and gas output surpassing 5,200 tons, CNOOC Tianjin Branch announced on Sunday. The project is of great significance for optimizing the regional energy structure and supporting high-quality economic and social development, the People's Daily reported.
China's natural gas reserves are unevenly distributed, with more in the west and less in the east. As the largest offshore gas field in eastern China, the project has cumulatively produced more than 2.8 billion cubic meters of natural gas and serves as an important force in ensuring a stable natural gas supply for the Beijing-Tianjin-Hebei region and the Bohai rim area. Coming fully online during the critical peak summer demand period, the Phase I project further meets the energy needs of regional residential life and industrial production, said the report.
Located in the central Bohai Sea, the Bozhong 19-6 gas field has proven natural gas geological reserves exceeding 200 billion cubic meters and proven petroleum liquid geological reserves of more than 200 million cubic meters. 
The Bohai Oilfield, where Bozhong 19-6 is located, is China's first ultra-large offshore oil and gas field with an annual output capacity of 40 million tons. In the first half of this year, its oil and gas output exceeded 21 million tons, setting a new historical high, the People's Daily reported.
Currently, drilling operations for Phase II of the Bozhong 19-6 gas field have fully commenced, which will further enhance the role of offshore oil and gas in supporting China's domestic energy supply.
Global Times

Current article:http://aqb418p.zongchaeiwengshuabaisisuofu.sbs/news/20260826_7662504.html

Published on:05:29:54